Go back to HSC home page.
Home > Our Projects
  Achievements

Below are our projects in chronological order:

2008

CHILLED WATER RETICULATION PIPELINE
  • Design, Supply and Lay 1000mm and 600mm Chilled Water Reticulation Pipelines in Woodlands Industrial Park D, Singapore

2007

CHILLED WATER RETICULATION PIPELINE
  • Design, Supply and Lay 900mm and 500mm Chilled Water Reticulation Pipelines in One-North Development, Singapore

2006

PowerGAS
  • Laying of High Pressure Gas Transmission Pipelines from Sakra to Tembusu and from Attap Valley to Woodlands Ave 9
PUBLIC UTILITIES BOARD
  • Proposed NEWater pipelines in Stamford Road Canal (from Killiney Road to Raffles Avenue)
CHILLED WATER RETICULATION PIPELINE
  • Design, Supply and Lay 1000mm, 700mm and 500mm Chilled Water Reticulation Pipelines in Woodlands Industrial Park D
  • Design, Supply and Lay 1000mm, 900mm and 450mm Chilled Water Reticulation Pipelines in Biopoils

2005

PowerGAS
  • Supply and laying of 315mm polyethylene gas mains along Ang Mo Kio Ave 1 from Ang Mo Kio Ave 8 to Lorong Chuan
PUBLIC UTILITIES BOARD
  • NEWater pipelines and In-Line Booster Pump Facility to serve Loyang and Changi North areas
  • Proposed NEWater pipelines in Stamford Road Canal (from Killiney Road to Raffles Avenue)

Bluetel

  • Design, supply, construction, installation, testing and commissioning of optic fibre network between NUS Campus in Kent Ridge and NUS High School

2004

PowerGAS
  • Laying of High Pressure Gas Transmission Pipeline from Tuas Power Station to Jurong Pier Road -- Section 1
PUBLIC UTILITIES BOARD
  • Supply, Laying And Welding Of 700mm Diameter Pipeline Along International Road From Tractor Road To Corporation Road

2003

PowerGAS
  • Diversion of High Pressure Gas Transmission Pipelines at Farrer Road
  • Commissioning of High Pressure Gas Transmission Pipeline from Jurong Island to Senoko Gas Works
Obayashi
  • PowerGas pipeline investigation and lifting works at junction of Woodlands Avenue 8 and Avenue 9

2002

PowerGAS
  • Supply and Laying of Gas Mains and Services in various HDB estates in West areas
  • Capping off of High Pressure Transmission Pipeline at Upper Paya Lebar Road
PUBLIC UTILITIES BOARD
  • Laying of Industrial Water Mains in Jurong Island and Tuas View -- Contract XVII
Obayashi
  • Replace and hot tap twin 610mm High Pressure Gas Transmission Pipelines at Woodlands Avenue 8
Bluetel
  • Construction of an Underground Optical Fibre Telecommunication Facility between the co-location room at Chai Chee Complex and the Cable Landing station at Katong

2001

PowerGAS
  • Supply and Lay High Pressure Gas Pipelines from Jurong Pier Road to Mandai - Section 1
  • Slip Lining works for PowerGas distribution network system
  • Supply and Lay High Pressure Gas Pipelines from Jurong Pier Road to Mandai - Section 2

2000

PowerGAS
  • Laying of Gas Pipeline under Proposed Ulu Pandan Park connector on drainage reserve land along Sungei Pandan
  • Rehabilitation of Gas Mains for PowerGas distribution network
  • Supply and Laying of Gas Mains and Services in various HDB estates in West areas
  • Supply and Laying of Gas Mains and Services in Area 3

1999

PowerGAS
  • Diversion of Existing 610mm Diameter Steel Gas Transmission Pipeline and Laying of twin 610mm diameter steel High Pressure Gas Transmission Pipelines
  • Supply and Laying of Gas Mains and Services for Upgrading precincts in HDB estates
  • Laying of twin 610mm diameter steel High Pressure Gas Transmission Pipeline At Jurong Island

1998

PowerGAS
  • Supply and Laying of Gas Mains and Services in Area 3
  • Polyethylene Slip Lining works at Stadium Road
  • Supply and Laying of polyethylene Gas mains and Services in Sentosa Cove
  • Supply and Laying of ductile iron and polyethylene Gas mains and Services in HDB estates - Jurong West New Town
  • Supply and Laying of ductile iron / polyethylene Gas Mains and Services to Paya Lebar Airbase cookhouse

1997

PowerGAS
  • Supply and Laying of Gas Mains and Services in various HDB estates in West areas
  • Supply and Laying of polyethylene Gas Mains

1996

PowerGAS
  • Supply and Laying of Gas Mains and Services in Area 1
  • Supply and Laying of Gas Mains and Services in various HDB estates in West areas

1995

PUBLIC UTILITIES BOARD
  • Supply and Laying of Gas Mains and Services in Area 1
 

HSC Pipeline Engineering specializes in:

1) Designing and Laying High Pressure Gas Transmission Pipelines


2) Performing Hot Tapping Operations to divert High Pressure Transmission Gas Mains


3) Designing and Laying Water Pipelines


4) Designing and Laying Fibre Optic Cables


5) Designing and Laying Chilled Water Reticulation Pipelines

Some of HSC’s recent achievements:

2008

• Successfully completed the engineering, procurement, construction, testing and commissioning of 1000mm and 600mm chilled water pipeline in Woodlands Industrial Park D, Singapore

2007

• Successfully completed the design, construction, testing and commissioning of 900mm and 500mm chilled water pipeline in One-North Development in Singapore

2006

• Successfully completed the construction & commissioning of Tembusu and Admiralty Offtake Stations to serve Keppel Merlimau Cogen


• Successfully completed the construction, testing and commissioning of 610mm high pressure gas transmission pipeline from Sakra Natural Gas Station to Tembusu Offtake Station to transport natural gas to Keppel Merlimau Cogen


• Successfully completed the construction, testing and commissioning of 610mm high pressure gas transmission pipeline from Attap Valley Onshore Receiving Facility to Admiralty Offtake Station to transport natural gas to Keppel Merlimau Cogen

• Successfully completed the hot tapping of 610mm high pressure gas pipeline at Woodlands Ave 9 to divert natural gas to Keppel Merlimau Cogen


• Successfully completed the construction, testing and commissioning of 1000mm, 700m and 500mm chilled water pipeline in Woodlands Industrial Park D


• Successfully completed the construction, testing and commissioning of 1000mm, 900m and 450mm chilled water pipeline at Biopolis

2005

• Successfully completed the construction, testing and commissioning of 610mm high pressure gas transmission pipelines from Tuas Power Station to Jurong Pier Road for PowerGas Ltd


• Successfully completed the construction and commissioning of the Jalan Mariam Booster Pump Station for Public Utilities Board


• Successfully completed the construction, testing and commissioning of 500mm and 300mm NEWater pipeline at Loyang and Changi North for Public Utilities Board


• Successfully completed the construction, testing and commissioning of Fibre Optic Cables from the National University of Singapore to NUS High School for Bluetel Networks Pte Ltd



©Copyright 2005. HSC Pipeline Engineering Pte Ltd. All rights reserved.